Hydroelectric power stations: 2 hydroelectric power stations installed at the base of the dam, & a secondary dam in loose materials (#rockfill) with a concrete facing 5 km long. The hydroelectric power stations are located on the right & left banks of the river and consist of 13 #Francisturbines, with a total installed capacity of 5,150 MW & an average of 15,700 GWh/year.
CO2 emissions: reduction of 1.3 million tons/year of CO2 emissions for the national power grid.
Workers: 25,000, with peaks of 10,000 ppl at a time. Over 95% came from nearby Ethiopian communities.
Structures to enable the construction of the dam within the site: internal road network, 2 bridges over the Blue Nile, landing strip for rapid connections with #AddisAbeba & 3 housing camps built to house 10,000 people, equipped with 3 medical centres & all the necessary services (schools, canteens, recreational areas, a club, a swimming pool, & sports fields).
Via WeBuild A.P.A.
#update
📌 Design for Humanity.
@NArcHomeArchitecture
BY NArcHome Architecture

Share with your friend now:
tgoop.com/NArcHomeArchitecture/9698