Changelog: • Fixed USSD dual sim. • Fixed Top speaker in lockscreen (using sensor overlay) • Disable sdrHdrRatio. • Enable HBM via disp_feature on udfps. • Enable screen off fingerprint. • Switch back to stock MiuiCamera. • Optimize cpu for performance.
Known Bugs: • Audio for fs19xx driver • More add FP will broken biometrics in strong app
Notes: • June, 2025 Security patch • Use one FP for strong biometrics in app • Use EvoX recovery for sideload
Credits: • Adarsh Grewal and Raghav for their Work. • Peridot Team. • Thanks to all tester.
Changelog: • Fixed USSD dual sim. • Fixed Top speaker in lockscreen (using sensor overlay) • Disable sdrHdrRatio. • Enable HBM via disp_feature on udfps. • Enable screen off fingerprint. • Switch back to stock MiuiCamera. • Optimize cpu for performance.
Known Bugs: • Audio for fs19xx driver • More add FP will broken biometrics in strong app
Notes: • June, 2025 Security patch • Use one FP for strong biometrics in app • Use EvoX recovery for sideload
Credits: • Adarsh Grewal and Raghav for their Work. • Peridot Team. • Thanks to all tester.
fire bomb molotov November 18 Dylan Hollingsworth yau ma tei How to create a business channel on Telegram? (Tutorial) Private channels are only accessible to subscribers and don’t appear in public searches. To join a private channel, you need to receive a link from the owner (administrator). A private channel is an excellent solution for companies and teams. You can also use this type of channel to write down personal notes, reflections, etc. By the way, you can make your private channel public at any moment. Matt Hussey, editorial director at NEAR Protocol also responded to this news with “#meIRL”. Just as you search “Bear Market Screaming” in Telegram, you will see a Pepe frog yelling as the group’s featured image. As the broader market downturn continues, yelling online has become the crypto trader’s latest coping mechanism after the rise of Goblintown Ethereum NFTs at the end of May and beginning of June, where holders made incoherent groaning sounds and role-played as urine-loving goblin creatures in late-night Twitter Spaces.
from us