Changelog: • Fixed Potrait MiuiCamera • Drop XiaomiParts • Improve Padding status bar • Update blobs to V816.0.9.0.UNPMIXM • Use HintManager for HWUI • Some small changes.
Notes: • Gapps builds • November, 2024 Security patch • Sign builds, Integrity pass by default • Use Halcyon recovery for sideload
Credits: • Adarsh Grewal and Raghav for their Work. • Thanks to all tester
Changelog: • Fixed Potrait MiuiCamera • Drop XiaomiParts • Improve Padding status bar • Update blobs to V816.0.9.0.UNPMIXM • Use HintManager for HWUI • Some small changes.
Notes: • Gapps builds • November, 2024 Security patch • Sign builds, Integrity pass by default • Use Halcyon recovery for sideload
Credits: • Adarsh Grewal and Raghav for their Work. • Thanks to all tester
Earlier, crypto enthusiasts had created a self-described “meme app” dubbed “gm” app wherein users would greet each other with “gm” or “good morning” messages. However, in September 2021, the gm app was down after a hacker reportedly gained access to the user data. The channel also called on people to turn out for illegal assemblies and listed the things that participants should bring along with them, showing prior planning was in the works for riots. The messages also incited people to hurl toxic gas bombs at police and MTR stations, he added. Co-founder of NFT renting protocol Rentable World emiliano.eth shared the group Tuesday morning on Twitter, calling out the "degenerate" community, or crypto obsessives that engage in high-risk trading. Administrators Today, we will address Telegram channels and how to use them for maximum benefit.
from us