RAMSPROJECTS Telegram 465
#OrionOS #ROM #Official #Peridot #U
OrionOS Andromeda - OFFICIAL | Android 14
Updated:
09/10/2024

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed Fingerprint on AOD
• Fixed MiuiCamera lags
• Switch to stock vibratorfeature
• Switch to Xiaomi health-ext hal aidl
• Build USB hal aidl from source

Notes:
• Gapps builds
• September, 2024 Security patch
• Use OrionOS recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
7👍2🔥2👏2



tgoop.com/ramsprojects/465
Create:
Last Update:

#OrionOS #ROM #Official #Peridot #U
OrionOS Andromeda - OFFICIAL | Android 14
Updated:
09/10/2024

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed Fingerprint on AOD
• Fixed MiuiCamera lags
• Switch to stock vibratorfeature
• Switch to Xiaomi health-ext hal aidl
• Build USB hal aidl from source

Notes:
• Gapps builds
• September, 2024 Security patch
• Use OrionOS recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo

BY rams•prjk // updates




Share with your friend now:
tgoop.com/ramsprojects/465

View MORE
Open in Telegram


Telegram News

Date: |

2How to set up a Telegram channel? (A step-by-step tutorial) Over 33,000 people sent out over 1,000 doxxing messages in the group. Although the administrators tried to delete all of the messages, the posting speed was far too much for them to keep up. The court said the defendant had also incited people to commit public nuisance, with messages calling on them to take part in rallies and demonstrations including at Hong Kong International Airport, to block roads and to paralyse the public transportation system. Various forms of protest promoted on the messaging platform included general strikes, lunchtime protests and silent sit-ins. While some crypto traders move toward screaming as a coping mechanism, many mental health experts have argued that “scream therapy” is pseudoscience. Scientific research or no, it obviously feels good. The main design elements of your Telegram channel include a name, bio (brief description), and avatar. Your bio should be:
from us


Telegram rams•prjk // updates
FROM American