Warning: mkdir(): No space left on device in /var/www/tgoop/post.php on line 37

Warning: file_put_contents(aCache/aDaily/post/ChaoticEvilMobster/-5779-5780-5781-5782-5783-5784-5785-5786-5787-5788-): Failed to open stream: No such file or directory in /var/www/tgoop/post.php on line 50
Thoughts of a chaotic evil mobster with adhd@ChaoticEvilMobster P.5786
CHAOTICEVILMOBSTER Telegram 5786
Forwarded from Grannel zir0 (Skeleton leader)
Info of what to do in a tall building if disabled and unable to get down stairs

Tldr: you can take the elevator unless the fire is extra horrid or building compromised or something
If that is the case then you wanna call 911, let them know exactly where in the building you are so they will come get you directly
❤‍🔥3💯3



tgoop.com/ChaoticEvilMobster/5786
Create:
Last Update:

Info of what to do in a tall building if disabled and unable to get down stairs

Tldr: you can take the elevator unless the fire is extra horrid or building compromised or something
If that is the case then you wanna call 911, let them know exactly where in the building you are so they will come get you directly

BY Thoughts of a chaotic evil mobster with adhd













Share with your friend now:
tgoop.com/ChaoticEvilMobster/5786

View MORE
Open in Telegram


Telegram News

Date: |

Choose quality over quantity. Remember that one high-quality post is better than five short publications of questionable value. Click “Save” ; Ng, who had pleaded not guilty to all charges, had been detained for more than 20 months. His channel was said to have contained around 120 messages and photos that incited others to vandalise pro-government shops and commit criminal damage targeting police stations. Find your optimal posting schedule and stick to it. The peak posting times include 8 am, 6 pm, and 8 pm on social media. Try to publish serious stuff in the morning and leave less demanding content later in the day. How to Create a Private or Public Channel on Telegram?
from us


Telegram Thoughts of a chaotic evil mobster with adhd
FROM American