Telegram Group Search

Open Telegram

rams•prjk // updates

www.tgoop.com/ramsprojects

If the open doesn't start, click here


rams•prjk // updates Telegram News

Date: |

Members can post their voice notes of themselves screaming. Interestingly, the group doesn’t allow to post anything else which might lead to an instant ban. As of now, there are more than 330 members in the group. Over 33,000 people sent out over 1,000 doxxing messages in the group. Although the administrators tried to delete all of the messages, the posting speed was far too much for them to keep up. A Hong Kong protester with a petrol bomb. File photo: Dylan Hollingsworth/HKFP. Public channels are public to the internet, regardless of whether or not they are subscribed. A public channel is displayed in search results and has a short address (link). Ng Man-ho, a 27-year-old computer technician, was convicted last month of seven counts of incitement charges after he made use of the 100,000-member Chinese-language channel that he runs and manages to post "seditious messages," which had been shut down since August 2020.
rams•prjk // updates from us



Telegram Group
Back To Top