RAMSPROJECTS Telegram 496
#EvolutionX #ROM #Unofficial #Peridot #U
Evolution X 9.6 - UNOFFICIAL | Android 14
Updated:
16/11/2024

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed Potrait MiuiCamera (broken if you use r/w)
• Added HTSR (re-enable after screen off)
• Enable smart pixel by default
• Improve padding status bar
• Rework refresh rate menu
• Update blobs to V816.0.9.0.UNPMIXM
• Use HintManager for HWUI

Notes:
• Gapps mini builds
• November, 2024 Security patch
• Sign builds, Integrity pass by default
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo



tgoop.com/ramsprojects/496
Create:
Last Update:

#EvolutionX #ROM #Unofficial #Peridot #U
Evolution X 9.6 - UNOFFICIAL | Android 14
Updated:
16/11/2024

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed Potrait MiuiCamera (broken if you use r/w)
• Added HTSR (re-enable after screen off)
• Enable smart pixel by default
• Improve padding status bar
• Rework refresh rate menu
• Update blobs to V816.0.9.0.UNPMIXM
• Use HintManager for HWUI

Notes:
• Gapps mini builds
• November, 2024 Security patch
• Sign builds, Integrity pass by default
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo

BY rams•prjk // updates




Share with your friend now:
tgoop.com/ramsprojects/496

View MORE
Open in Telegram


Telegram News

Date: |

How to create a business channel on Telegram? (Tutorial) Joined by Telegram's representative in Brazil, Alan Campos, Perekopsky noted the platform was unable to cater to some of the TSE requests due to the company's operational setup. But Perekopsky added that these requests could be studied for future implementation. While the character limit is 255, try to fit into 200 characters. This way, users will be able to take in your text fast and efficiently. Reveal the essence of your channel and provide contact information. For example, you can add a bot name, link to your pricing plans, etc. Members can post their voice notes of themselves screaming. Interestingly, the group doesn’t allow to post anything else which might lead to an instant ban. As of now, there are more than 330 members in the group. A new window will come up. Enter your channel name and bio. (See the character limits above.) Click “Create.”
from us


Telegram rams•prjk // updates
FROM American